Should I dare to show a price per square metre?
+
As an indicative range, yes. Whoever sees it fits their budget calls; whoever does not will not waste your time. In the quote you still give the final price after measuring up.
How accurate can a quote be based on photos?
+
For simple painting, if the size and photos are there, often accurate enough. For more complex work (old wallpaper, damp walls, tiling) you still measure up after the form, but you already know what to expect.
I do not have many reference photos. Is that a problem?
+
6–8 well-photographed jobs are worth more than fifty bad pictures. I show you how to take photos at handover with your phone (light, angle, tidiness), and the site can be expanded at any time.
How long does it take?
+
A company website usually takes 3–5 weeks, provided the texts and images are available. The quote form is included.